With this new energy savings project, Veregy is slated to save the school district $58 million over the next 25 years. The district’s website states: “Students learn about the benefits of the project and enhance their science knowledge as they gain hands-on experience with the technology that is changing the outlook of the MSD Wayne Township.” This system consisting of over 7,200 solar panels and two natural gas generators, has saved the school over $700,000 annually since start-up and provides a unique, first-hand learning experience for students. In 2018, the district partnered with the Veregy team (previously known as Johnson Melloh Solutions) to design and install a 2.5MW solar farm at Ben Davis High School. MSD Wayne Township is no stranger to renewable energy projects. “The district has seen the benefits of our partnership with Veregy with the solar farm at Ben Davis High School and the savings it has generated for the district.” Barry Gardner, Chief Financial Officer for MSD Wayne Township. “MSD Wayne Township is excited to embark upon our district-wide energy management project with Veregy,” said Mr. The project is slated to begin work this summer. The project, priced at $26 million, will feature twenty different energy conservation measures ranging from solar energy & battery storage to on-site daily energy monitoring and LED lighting. Indianapolis, IN, Ma(GLOBE NEWSWIRE) - MSD of Wayne Township has recently partnered with Veregy to install a district-wide energy savings project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |